Kaliubia – Ibrahim Salem
Saturday, June 17, 2023 02:00 AM
9 years of planning, diligence and perseverance in the hands of the people of Egypt, after which the harvest of this spent effort began, the Egyptian citizen touched the ground with the results of these projects, because these projects covered various sectors under the President. Initiative, disciplined life.
“Al-Qalubiyya province“In the governorates of the republic that have been affected by reconstruction and construction in recent years in many sectors such as health, education, roads, drinking water, sewage, housing and various other sectors, these projects will be transferred to the people of the governorate and neighboring governorates as the governorate is one of the governorates that connect several governorates. .
Sharq al-Raya al-Tawfiqi axis, one of the Shubra-Banha al-Har forging projects.:
The Shubra-Banha Free Road, 38,720 km long and 41 meters wide, at a cost of 5 billion pounds, comprising 38 bridges and 24 tunnels, is among the axles re-established in Qalyubia land. The project was inaugurated by President Abdel Fattah el-Sisi on January 8, 2018, expropriating assets. Ring road from Shubr al-Khaimah especially from Umm Bayomi area and Banha to regional ring road to connect the road to the city..
Regional Ring Road “Banha Ismalia Desert” and “Banha El-Sadat”.“
There was also an urgent need to construct a regional ring road within the boundaries of Qalubiyya Governorate, delineating “Banha Ismalia Desert” and “Banha El-Sadat”. In fact, the implementation of a length of 17.87 has been completed within the boundaries of the governorate. km within the boundaries of the governorate, which has a commercial value of £1.4 billion, is divided into 5 sectors. And it was inaugurated on September 9, 2018 by President Abdel Fattah el-Sisi..
Lt. Gen. Muhammad Al-Azhar’s focus:
The road was built to connect Heliopolis with Shubra Al-Khaimah, Shubra-Banha Free Road and Tahya Misr Corridor with a length of 18 km. The works were carried out along a 4.2 km stretch in the western and eastern suburbs of Shubra. Al-Khaimah, which was inaugurated by President Abdul Fattah al-Sisi via video. Conference on June 29, 2020
Print of oil companies in Mostaród
Qalyubia Governorate has completed the development of the axis of oil companies in the Mostarod region, where the project was interested in exploiting some places to build a corniche on the Ismailia Canal in the eastern Shubra Al-Khaimah neighborhood. Create alternative routes to achieve the necessary traffic flow. The completion of the Mostoroad and the construction of a secure complex to establish waiting areas and legal parking on the canal and the installation of a civil wall on the Ismalia canal and the development of risers and houses of the ring road, the value of the project and its costs were borne by the oil companies at 90 million pounds..
The pavement works on the new axis
Road workflow
Road network in the land of Caliupia
Supra Panha connects the free road loop
Supra Panha Freeway
Axis of the emergency canal at Caliubia
East wind synchronous axis
International Specifications for Road Network
“Award-winning beer geek. Extreme coffeeaholic. Introvert. Avid travel specialist. Hipster-friendly communicator.”